成人男同av,在线黄色网,在线观看一区二区三区四区,日本六九视频,国产一区二区三区久久久久久久久,成人97视频,国产性猛交乱

軟題庫 學習課程
試卷年份2014年上半年
試題題型【單選題】
試題內(nèi)容

    Information systems planners in accordance with the specific information system planning methods developed information architecture.Information Engineering follow(1 )approach,in which specific information systems from a wide range of information needs in the understanding derived from(for example,we need about customers,products,suppliers,sales and processing of the data center),rather than merging many detailed information requested(orders such as a screen or in accordance with the importation of geographical sales summary report).Top-down planning will enable developers(2 )information system,consider system components provide an integrated approach to  enhance the information system and the relationship between the business objectives of the understanding,deepen their understanding of information systems throughout the organization in understanding the impact.
Information Engineering includes four steps:(3 ),( 4),design and implementation. The planning stage of project information generated inforamtion system architecture,(5 )enterprise data model.
(1 )A.Down-top planning
B.sequence planning
C.Top-down planning
D.parallel planning
(2)A.to plan more comprehensive
B.to study more comprehensive
C.to analysis more comprehensive
D.to plan more unilateral
(3)A.studying
B.planning
C.researching
D.considering
(4 )A.consider
B.study
C.plan
D.a(chǎn)nalysis
(5 )A.including
B.excepting
C.include
D.except

查看答案

相關試題

61題: 系統(tǒng)響應時間是衡量計算機系統(tǒng)負載和工作能力的常用指標。小趙在某臺計算機上安裝了一套三維圖形掃描系統(tǒng),假設小趙用三維圖掃描系統(tǒng)完成一項掃描任務所占 用的計算機運行時間Tuser=100s;而啟動三維圖形掃描系統(tǒng)需要運行時間Tsys=30s,那么該系統(tǒng)對小趙這次掃描任務的響應時間應該是( )
A.100s
B.30s
C.130s
D.70s
答案解析與討論:www.conferencecallsmadeeasy.com/st/3118813447.html

62題: 信息系統(tǒng)建成后,根據(jù)信息系統(tǒng)的特點、系統(tǒng)評價的要求與具體評價指標體系的構(gòu)成原則,可以從三個方面對信息系統(tǒng)進行評價,這些評價一般不包括( )
A.技術性能評價
B.管理效益評價
C.經(jīng)濟效益評價
D.社會效益評價答案解析與討論:www.conferencecallsmadeeasy.com/st/3118916659.html

63題: 企業(yè)信息化建設需要大量的資金投入,成本支出項目多且數(shù)額大。在企業(yè)信息化建設成本支出項目中,系統(tǒng)切換費用屬于( )
A.設備購置費用
B.設施費用
C.開發(fā)費用
D.系統(tǒng)運行維護費用
答案解析與討論:www.conferencecallsmadeeasy.com/st/3119024519.html